Sl
No.

Name & Address of
Employer

Description of Work

Value of Contract

Date of completion

Remarks

1.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of four lane Tripura Road including Electrical Works from NH-37 to G.S Rd under NLCPR (Gr. A,B,C & D).

1120.81
Lakhs

Jan
2009

Completed before the stipulated period of completion.

2.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement of Nakhola-Bhakatgaon-Manaha-Rajamayong-Kajaolichaoki road in Morigaon Dist of Assam, under RIDF-XI of NABARD.

1678.24
Lakhs

June
2009

Completed within the extended period of completion.

3.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of Rural roads, culverts, minor bridge and routine maintenance of the work for five years under PMGSY (Regular), Ph-VIII for the year 2008-09 Package No. AS-05-64

1395.53
Lakhs

March 2012

Completed within the stipulated period of completion.

4.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement and widening of Borkhat-Borni Road, Ghy (Rd. L=14.246 km) under North Ghy S.R. Division under SPA for the year 2012-13. Package No. KAM(M)/SPA/01

3326.71

May
2016

Completed before the stipulated period of completion.

5.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement of Bakrapara Latakata road upto Meghalaya Border at Ganesh Nagar. (Rd L= 3.50

km).

1878.43

March 2016

Completed before the stipulated period of completion.

6.

Chief Engineer, PWD (Border Rds& NEC Works) Assam, Chandmari, Ghy-3

Improvement of Road from Gauripur Kalimandir (NH- 31) to Chowrange area.

1060.40

September
2014

Completed within the stipulated period of completion.

7.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of Road from Karunri to Binachora (Satgharia) via Nalia including protection works and 4-RCC bridges under NLCPR

3855.04

May
2017

Completed before the extended period of completion.

8.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement and widening of Ghy Fatasil Road and construction of footpath cum drain (from Ch. 0.00m at Fatasil to Ch. 7215.00m to Garchuk, NH-37) under ACA for the year 2013-14

3679.99

May
2017

Completed before the extended period of completion.

9.

Chief Engineer, PWD(PMGSY Works) Assam, Chandmari, Ghy-3

Construction of Rural Roads, Culverts, Minor Bridge and Routine Maintenance of the work for five years under PMGSY(ADB, Batch-II)Ph-VII for the year 2007-08, Package No. AS-05-39.

980.50
Lakhs

Jan
2011

Completed within the stipulated period of completion.

10.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of Rural Roads, Culverts, Minor Bridge and Routine Maintenance of the work for five years under PMGSY(Regular)Ph-VIII for the year 2008-09, Package No. AS-05-60.

926.87
Lakhs

Sept
2011

Completed within the stipulated period of completion.

11.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement of Pratapganj Kherbari Road(Sec II) in Agamari Bazar Area. (from Ch 0.00 to 2000.00m) (Rd L=2.00 km) under Dhubri Rural Road Division under SPA for the year 2012-13.

959.11
Lakhs

March
2015

Completed within the stipulated period of completion.