1.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of road from Abhaypuria to Pulibor via Halmira including construction of RCC Br.No. 3/4 Dhansiri under RIDF-XVI of NABARD.

1782.18

January
2014

Completed

2.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of RCC Br.No. 1/1 on Ratiadaha to Satrasal road, Br. No. 2/1 on 1st km of KD Road to Lakhimari Part-III road, Br no. 5/1& 5/2 on Kaldoba to WB Border Road & Br.No.1/1 on 4th km of Nh-31 to Bidyardabri Pt-III. PMGSY
Package No. AS-05-71

732.56

November
2015

Completed

3.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Design and Construction of RCC bridge No.2/1 over river Nakhanda on Barpeta Daulasal Road under   RIDF-III of NABARD. AGCC/T/CS/6/99/27 Dt. 27/04/2000

485.00

September
2002

Completed

4.

Chief Engineer, Pwd (ARIASP&RIDF)Assam,  Chandmari,Ghy-3

Construction of RCC Bridge over river Kollong at Kajalimukh (Balance work) under RIDF-III of NABARD.
T/BR/CZ/13/88/Pt.II/32 Dt. 10/11/1997

761.27

November
1999

Completed

5.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of double lane RCC Br.No. 27/1, 30/4, 34/1 &39/3 with Approaches and Protection works on Bhanga Anipur Kanaibazar road under NEC.

371.35

November 2007

Completed

6.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of double lane RCC Bridge No. 4/3, 7/2& 11/2 with approaches, subways& protection works on Silchar Dwarbond Gaglacherra Belalpur Phasin Road under NEC.
Package No. 10/11  CE/NEC/BR/20/2006/3 Dtd. 3/6/2006

357.10

January 2008

Completed

7.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of double lane RCC Br. No.8/1 over river Gadadhar on Gauripur Bashbari road under RIDF-IX of NABARD.
T/BR/NABARD/RIDF-IX/2045/03/04/4 Dtd. 7/12/2

252.76

August
2006

Completed

8.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of double lane RCC Br. No.6/1 on Dhubri-Binnacherra road under RIDF-IX of NABARD.
T/BR/NABARD/RIDF/IX/2023/03/04/4  Dtd. 7/12/04

266.70

July 2007

Completed

9.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Improvement of road from NH-31 at Ratiadaha to Indo Bangladesh Border (Near Sonahat) via Kanuri Pt-I under Ministry of Commerce & Industry, GOI Const of RCC Br. No. 8/1 over Channel Pakhihaka & RCC Br.No.9/1over river Torsha.
T/BR/State/ASIDE/212/06/07/28 Dtd. 11/05/07.

218.29

December
2008

Completed

10.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of double lane RCC Bridge at Ch. 13570.00m, Ch.14015.00m & Ch.4869.00m on Z.H.D road
CE/NEC/BR/8/2002/Pt/18  Dtd. 25/03/2003

230.07

February
2004

Completed

11.

Chief Engineer, Pwd (ARIASP&RIDF)Assam,  Chandmari,Ghy-3

Design & Construction of RCC Bridge No.1/1 over river Towtak on Thukubil Satra road under RIDF-VIII of NABARD
T/BR/NABARD/RIDF-VIII/2030/02/03/1

212.07

August
2005

Completed

12.

Chief Engineer, PWD(R) Assam, Chandmari, Ghy-3

Construction of four lane RCC Bridge over Basistha Channel on Hatigaon-Bhetapara road.
T/BR/59/2000/17  Dtd. 04/06/2003

145.42

May
2004

Completed